Board of Directors
Objectives and Values
Synopsis
Location & Tenure
Geology
Regional Geology
Geology of Kalia
Exploration History
Exploration Program 2007-2008
Exploration Program 2009
Exploration Program 2010
Oxidised Ore's of Kalia
Magnetites of Kalia
Site Development
Mine Planning
Project
Project Summary
Mine Site
Rail System
Port Facilities
Assessments
Socio Economic
Environmental Management
Project Development and Implementation
Project Delivery Model
OH&S and Security
Project Economics
General News
Announcements
Site Development
Camp
Core Shed
Camp Overview
Standard Accomodation Block (1)
Standard Accomodation Block (2)
Access Roads
Camp
Core Shed
Camp Overview
Standard Accomodation Block (1)
Standard Accomodation Block (2)
Access Roads
Site Development
Camp
Construction of the Kalia camp commenced in early 2006. The camp is located approximately 2km south of the central part of Kalia
I
and was expanded during 2007 / 8 to support the resources required for the drilling programme, site infrastructure and the camp currently has the following facilities;
Accommodation for up to 50 people
Messing and kitchen facilities to meet the accommodation requirements
Covered warehousing facilities
Parking areas for all on site equipment
Maintenance facilities to maintain the equipment
Core storage and assessment facilities
Medical facilities and onsite doctor
Fully operational and serviced office
Generators
Diesel storage
Potable water system
Sewerage system
Relaxation and social under cover areas
Security
Multiple access gates
Communication system
Recreational areas
Equipment
In support of the onsite work programme Bellzone has the following equipment on site;
6 diamond drill rigs
1 RC drill rig
3 Heavy haul trucks and trailer
4 earthmoving trucks
1x 14H Grader
2 Excavators
1 Backhoe
1 Roller compactor
9 Light vehicles
1 8x8 Palfinger MAN truck
1 4x4 Ambulance
3 Water tankers
2 Bulldozers
1 Medium lift cranes
2 Mobile personnel cranes
2 Multipurpose trucks
2 Weather proof sheds
1 Forklift
1 Service truck
Kalia
I
and Surrounding Access and Surrounding Access
Bellzone has developed and maintains in excess of 150km of road network across Kalia
I
and Kalia
II
and the surrounding areas. The roads were developed by D9 caterpillar bulldozers.
The road network provides access to the iron mineralisation and access for drill rigs and support equipment.
The content of this website is for information only, if in doubt please refer to the attached terms and conditions of use.